The estimated average base flow in Sheep Creek at the project is 15 cfs and at its confluence with the Smith River is 30 cfs during low flow periods of November through March. The average base flow in the Smith River during this period is approximately 90-100 cfs. Sheep Creek provides approximately 10% of the flow passing by the project and 30% of the flow in the Smith River at their confluence.